After analysing all the findings obtained from 9 years of consultations and 2 years of pilot assessments, the SRA finalised the design of the SQE on 8 June 2020.
SQE final design unveiled
What you will read in this post
After analysing all the findings obtained from 9 years of consultations and 2 years of pilot assessments, the SRA finalised the design of the SQE on 8 June 2020.